Checking conditions…

Nasir Hussain Shah Inspects Karachi Infrastructure Projects

Sindh Minister Reviews Work on Korangi Flyover and Shahrah-e-Bhutto

By The Reviser DeskPublished Aug 10, 2026, 11:46 PMUpdated Aug 11, 2026, 1:30 AM1 min read
Nasir Hussain Shah Inspects Karachi Infrastructure Projects

KARACHI FLYOVER NEAR COMPLETION

Illustration concept: A wide-angle photo of an elevated flyover construction site in Karachi with engineers, machinery, and government officials wearing safety vests under a clear sky.

AI summary

Sindh Minister for Local Government Nasir Hussain Shah conducted on-site inspections of major infrastructure projects across Karachi, including the Korangi No 5 Flyover and Shahrah-e-Bhutto. During the visit, officials received direct orders to accelerate construction work on key arterial link roads.

Why this matters

Commuters in Karachi frequently experience severe traffic congestion, making the timely completion of major transit corridors like the Korangi No 5 Flyover critical for daily travel. Accelerating connectivity between DHA, Shahrah-e-Bhutto, and nearby residential quarters aims to ease persistent bottlenecks across key commercial and industrial belts.

Key takeaways

  • Sindh Local Government Minister Nasir Hussain Shah inspected major civic infrastructure projects across Karachi.
  • The Korangi No 5 Flyover project has reached its final construction phase and will soon be opened to traffic.
  • Officials were directed to accelerate work on the Shahrah-e-Bhutto road network and its loop connecting DHA to Ayesha Mosque.
  • Additional Chief Secretary Dr Wasim Shamshad accompanied the minister during briefings on project completion timelines.

Infrastructure work across crucial traffic corridors in Karachi received a direct review as Sindh Minister for Local Government Nasir Hussain Shah inspected several high-priority construction sites in the metropolis.

Accompanied by Additional Chief Secretary Sindh Dr Wasim Shamshad and senior departmental officials, the minister received detailed briefings on construction progress, engineering targets, and target completion dates for ongoing developments.

During the site visit to Shahrah-e-Bhutto, Shah surveyed ongoing development and road beautification efforts, issuing strict instructions to authorities to accelerate execution schedules. He specifically examined the vehicular loop connecting Shahrah-e-Bhutto with Defence Housing Authority (DHA) alongside the link road extending toward Ayesha Mosque, urging officials to complete the stretch from DHA to Ayesha Mosque without delay.

Emphasising the strategic value of the route, the minister noted that the link road would serve as an essential facility for citizens traveling through the area, stressing that meeting timeline commitments was imperative.

The delegation also evaluated progress on the Korangi No 5 Flyover project. Shah announced that construction on the flyover has entered its final phases and will soon open for public use, providing much-needed traffic relief to daily commuters.

Frequently asked questions

Which infrastructure projects were inspected in Karachi?
Sindh Local Government Minister Nasir Hussain Shah visited Shahrah-e-Bhutto, the Korangi Causeway Bridge, and the Korangi No 5 Flyover.
What is the status of the Korangi No 5 Flyover?
The project has entered its final stages of construction and is set to open soon for public vehicular traffic.
What directives were given for the DHA link road?
The minister instructed officials to fast-track remaining development works on the road link connecting DHA with Ayesha Mosque to improve local connectivity.

Source & transparency

By:
The Reviser Desk
Source:
Business Recorder
Original publication:
Aug 10, 2026, 11:46 PM
The Reviser publication:
Aug 10, 2026, 11:46 PM
Updated:
Aug 11, 2026, 1:30 AM

This report was independently written by The Reviser editorial desk from verified source material. It is not original on-the-ground reporting by The Reviser.

Related stories

AJK Elections Phase 3: Voting Starts in Bagh and Haveli

AJK POLLS PHASE 3

Pakistan1 min read

AJK Elections Phase 3: Voting Starts in Bagh and Haveli

AI summaryPolling has commenced across four electoral constituencies in the Bagh and Haveli districts for the third round of the Azad Jammu and Kashmir Legislative Assembly elections. Over 460,000 registered citizens are casting their ballots for 72 candidates, including the sitting prime minister and two former premiers.

By The Reviser Desk

Share

Comments (0)